Foundation stone laid for second hotel in Andermatt

In Andermatt, the foundation stone was laid for the second hotel in the Andermatt Swiss Alps tourist resort. The hotel, the associated residence building and the public indoor swimming pool are being built at the same time.

Visualization: Andermatt Swiss Alps AG

For the first time, Andermatt Swiss Alps AG is joined by a co-investor in Andermatt, the Belgian Besix Group. Together with Andermatt Swiss Alps AG, the Besix Group had founded Hotel 4B Development AG, which will now realize the project in Andermatt.

Over the next two years, a four-star hotel with 180 rooms, two restaurants, bars and a conference/events section, as well as a separate building section with around 100 so-called Gotthard Residences, will be built on the construction site on the edge of the tourist resort. These are offered in a spectrum ranging from studios of 44.5 square meters to 4.5-room apartments of over 133 square meters. Prices start from CHF 450,000. (ah)

(Visited 158 times, 1 visits today)

More articles on the topic